
Upgrade your Cambie Village bathroom with walk-in showers, freestanding tubs, heated floors, and custom tile work. VGC delivers full design-build bathroom renovations — from $35K – $55K in Cambie Village.
We respond within 24 hours — no obligation.




















Every VGC bathroom renovation in Cambie Village includes design, materials, labour, and permits — all in one fixed-price contract.
In-home consultation, space planning, and 3D renderings. We optimize every square foot of your bathroom.
Walk-in showers with frameless glass, freestanding soaker tubs, or tub-shower combos. Custom tile and niches.
Custom or semi-custom vanities, medicine cabinets, and built-in storage to maximize your bathroom space.
New supply lines, drains, and premium fixtures from brands like Kohler, Grohe, and Moen.
In-floor radiant heating, upgraded exhaust fans, and proper moisture management to prevent mold.
Floor-to-ceiling tile, custom mosaic accents, paint, trim, lighting, and all finishing details.
Based on VGC’s completed bathroom renovation projects in Cambie Village. All prices include design, labour, materials, permits, and our 2-year warranty.
Bathroom renovations from $20K–$45K (mid-range $28K). Laneway homes from $260K–$460K. All prices are estimates — final cost depends on scope, materials, and site conditions. Get your free personalized estimate
Drag the slider to see the transformation — every project managed from design through completion.

BeforeAfter



We know Cambie Village’s heritage considerations, Canada Line corridor development, and Vancouver permit processes inside and out.
1920s–1940s heritage homes along the boulevard. Protected trees and heritage guidelines require careful renovation planning to preserve character.
Rapidly densifying with new condos and townhouses. Older single-family homes being renovated or replaced — strong investment potential.
1950s–1970s family homes near Douglas Park. Mid-century homes with generous lot sizes ideal for additions and laneway homes.
Major redevelopment zone with new condos and mixed-use. Existing strata buildings need kitchen and bathroom upgrades to compete.
1940s–1960s character homes near Nat Bailey Stadium. Popular for whole-home renovations that maintain neighbourhood charm.
Mix of 1970s–1990s homes and newer townhouse developments. Growing demand for basement suites and secondary dwelling units.
We handle every detail so you can enjoy the transformation — not the stress.

Our design team creates 3D renderings of your new space — so you can see the finished result before we break ground.

We lock in your budget, timeline, and materials — so there are zero surprises during construction.

Your dedicated project manager oversees every trade, every detail, and every deadline — right here in Cambie Village.

“VGC exceeded every expectation. The attention to detail is incredible — our kitchen feels completely transformed.”
“From start to finish VGC was above expectations. Kia the project manager was exceptional. His patience and knowledge were very appreciated.”
“We couldn’t be happier with the results. The team was responsive with quality workmanship — a truly stress-free renovation experience.”
“Best experience we have had with contractors. Professional, responsive, and efficient — with final results being very clean and of high quality.”
“Communication has been excellent and the team is professional, reliable, and easy to work with. Highly recommend.”
From 3D bathroom layouts to final grout — one team manages your entire bathroom renovation.
Your bathroom renovation price is locked before we start. No change orders, no surprises.
Schluter and Kerdi waterproofing systems in every shower. No leaks, guaranteed.
Full 2-year workmanship warranty plus manufacturer warranties on all fixtures and materials.
Most bathroom renovations completed in 4–8 weeks. We provide a detailed schedule upfront.
VGC manages all permit applications, inspections, and plumbing sign-offs for your bathroom project.





VGC handles all permit applications, drawings, and inspection coordination for your Cambie Village project.
8–14 week processing via Fast Track stream. City of Vancouver Development Services (515 W 10th Ave).
8–12 week processing. Must meet BC Building Code for fire separation, egress, and independent utilities.
16–28 week processing. Site-specific setbacks, lot coverage, and FSR limits apply.
16–28 week processing. Up to 0.16 FSR or 750 sq ft on RS-zoned lots with lane access.
Additional permit required for exterior changes on Heritage Register properties. Interior renovations generally exempt.
Apply online through Vancouver’s eDev portal at services.vancouver.ca. VGC handles the entire process for you.
Click any service for Cambie Village-specific pricing, permit details, and our project history.
We serve homeowners and businesses throughout the Lower Mainland. Click your area for local bathroom renovation info.


“I only put my name on companies I’d hire myself.”

Tell us about your Cambie Village bathroom renovation project. We’ll get back to you within 24 hours with a free consultation — no obligation, no pressure.