
Transform your West End kitchen with custom cabinetry, quartz countertops, and modern layouts. VGC designs and builds kitchens that are beautiful, functional, and built to last — from $50K – $75K in West End.
We respond within 24 hours — no obligation.




















Every VGC kitchen renovation in West End is a full design-build service. Here’s what’s included in your fixed-price contract.
In-home consultation, measurements, and photorealistic 3D kitchen renderings so you can see your new kitchen before we start.
Complete removal of existing cabinets, countertops, backsplash, and flooring. All disposal and site protection included.
Semi-custom or fully custom cabinets with soft-close hinges, pull-out organizers, and your choice of finishes and styles.
Quartz, granite, or marble countertops with matching or contrasting full-height backsplash tile.
Updated wiring, pot lights, under-cabinet LED lighting, new plumbing lines, and fixture installation.
Engineered hardwood, luxury vinyl, or tile flooring. Paint, trim, and all finishing details.
Based on VGC’s completed kitchen renovation projects in West End. All prices include design, labour, materials, permits, and our 2-year warranty.
Bathroom renovations from $18K–$42K (mid-range $26K). The West End is predominantly condos — most projects are kitchen, bathroom, and full-unit renovations. All prices are estimates — final cost depends on scope, materials, and site conditions. Get your free personalized estimate
Drag the slider to see the transformation — every project managed from design through completion.

BeforeAfter



We know the West End’s strata buildings, condo renovation logistics, and City of Vancouver permit processes inside and out.
1960s–1980s concrete highrise towers with ocean views. Aging units benefit from full kitchen and bathroom renovations — plumbing stacks and electrical panels are common upgrade points.
1970s–1990s mix of lowrise walk-ups and highrise towers along Davie Street. Vibrant neighbourhood with older units that benefit from modern open-concept conversions.
1980s–2000s condos near Vancouver’s premier shopping corridor. Popular for cosmetic kitchen refreshes and bathroom upgrades in investment rental units.
1990s–2010s luxury highrise condos at the north edge of the West End. High-end finishes and premium materials are standard for renovations in this area.
1960s–1980s lowrise apartments and older highrises along Denman. Many units retain original layouts — wall removals and galley kitchen expansions are popular projects.
1970s–1990s residential towers near Nelson Park and St. Paul’s Hospital. Mid-century units with strong rental demand — renovations boost both liveability and rental returns.
We handle every detail so you can enjoy the transformation — not the stress.

Our design team creates 3D renderings of your new space — so you can see the finished result before we break ground.

We lock in your budget, timeline, and materials — so there are zero surprises during construction.

Your dedicated project manager oversees every trade, every detail, and every deadline — right here in West End.

“VGC exceeded every expectation. The attention to detail is incredible — our kitchen feels completely transformed.”
“From start to finish VGC was above expectations. Kia the project manager was exceptional. His patience and knowledge were very appreciated.”
“We couldn’t be happier with the results. The team was responsive with quality workmanship — a truly stress-free renovation experience.”
“Best experience we have had with contractors. Professional, responsive, and efficient — with final results being very clean and of high quality.”
“Communication has been excellent and the team is professional, reliable, and easy to work with. Highly recommend.”
From 3D kitchen renderings to final trim — one team, one contract, one point of contact.
No surprise costs. Your kitchen renovation price is locked before we start demolition.
Our kitchen designers are NKBA members — trained in the latest kitchen layout and ergonomic standards.
Every kitchen renovation includes our 2-year workmanship warranty, plus manufacturer warranties on all materials.
We provide a detailed week-by-week schedule before your kitchen renovation starts.
VGC manages all permit applications, inspections, and compliance for your kitchen project.





VGC handles all permit applications, drawings, and inspection coordination for your West End project.
8–14 week processing via Fast Track stream. City of Vancouver Development Services (515 W 10th Ave).
8–12 week processing. Must meet BC Building Code for fire separation, egress, and independent utilities.
16–28 week processing. Site-specific setbacks, lot coverage, and FSR limits apply.
16–28 week processing. Up to 0.16 FSR or 750 sq ft on RS-zoned lots with lane access.
Multiplex conversions available on most Vancouver RS lots under BC’s Bill 44 housing legislation.
Apply online through Vancouver’s eDev portal at services.vancouver.ca. VGC handles the entire process for you.
Click any service for West End-specific pricing, permit details, and our project history.
We serve homeowners and businesses throughout the Lower Mainland. Click your area for local kitchen renovation info.


“I only put my name on companies I’d hire myself.”

Tell us about your West End kitchen renovation project. We’ll get back to you within 24 hours with a free consultation — no obligation, no pressure.